• This is a political forum that is non-biased/non-partisan and treats every person's position on topics equally. This debate forum is not aligned to any political party. In today's politics, many ideas are split between and even within all the political parties. Often we find ourselves agreeing on one platform but some topics break our mold. We are here to discuss them in a civil political debate. If this is your first visit to our political forums, be sure to check out the RULES. Registering for debate politics is necessary before posting. Register today to participate - it's free!

Trump halts work on 80% complete offshore wind project, citing bogus ‘national security interests’

BabaVoss

Rational : Socially Liberal, Fiscally Conservative
DP Veteran
Joined
May 14, 2023
Messages
14,615
Reaction score
19,727
Gender
Male
Political Leaning
Other
The project is just temporally shut down for a security review. We don't want our key energy infrastructure stamped with the 'made in China' label. Its too easy for them to manipulate it for politcal and military purposes.
 
The project is just temporally shut down for a security review. We don't want our key energy infrastructure stamped with the 'made in China' label. Its too easy for them to manipulate it for politcal and military purposes.
Not a single person, including yourself, believes that is what this is about.
 
The project is just temporally shut down for a security review. We don't want our key energy infrastructure stamped with the 'made in China' label. Its too easy for them to manipulate it for politcal and military purposes.
So why then cancel all the clean energy projects that were meant to compete with China in that space? Trump is letting the Chinese dominate in one of the fastest growing sectors. Instead of investing in American manufacturing he's killing it and handing it to China.....all 'cause clean energy is "woke". Just SMH at the stupidity.
 
The project is just temporally shut down for a security review. We don't want our key energy infrastructure stamped with the 'made in China' label. Its too easy for them to manipulate it for politcal and military purposes.
This is a Danish wind farm developer. Your excuse is even more lame than the white house. It's just another stupid thing trump has ordered and benefits not a soul but potentially hurts many.
 
Good job MAGA. Energy prices, specifically, natural gas, are getting ready to skyrocket.

It all comes out of your wallets.

Idiots
 
The "national security interest" is simply Trump's hatred for windmills.

 
This is a Danish wind farm developer. Your excuse is even more lame than the white house. It's just another stupid thing trump has ordered and benefits not a soul but potentially hurts many.
Just because its a Danish project doesn't mean it doesn't use Chinese components. China is the largest manufacturer of wind turbine components by far.
 
The project is just temporally shut down for a security review. We don't want our key energy infrastructure stamped with the 'made in China' label. Its too easy for them to manipulate it for politcal and military purposes.
The components came from Denmark, France and Louisiana.

Google search took 30 seconds…not even.
 
The components came from Denmark, France and Louisiana.

Google search took 30 seconds…not even.
If really so, it should have no trouble passing its security review.
 
If really so, it should have no trouble passing its security review.
That’s a BS reason.

Everyone knows it.


I’m no fan of offshore wind. In fact, I’ve been opposed to these projects.

But stopping them at a federal level by utilizing bullshit reasons isn’t the answer. And it does nothing.

Now you’ll wind up with a half-completed project sitting off the coast causing its own set of headaches and problems.


But idiot MAGAs and this idiot Administration don’t do things intelligently.
 
Stupid, wasteful and incompetent.

When does this end?

How much waste will our Congress stand by and allow while this corrupt criminal destroys so much?

only 3.5 more years unless the unthinkable happens ;)
 
Just because its a Danish project doesn't mean it doesn't use Chinese components. China is the largest manufacturer of wind turbine components by far.
Sadly......it could be the US
.
 
Stupid, wasteful and incompetent.

When does this end?

How much waste will our Congress stand by and allow while this corrupt criminal destroys so much?

The company had satisfied all the requirements and started construction two years ago. Will they now be reimbursed for their lost investment?
 
The only reason I can see that the project can be stopped by the president is if it is using federal funding.

The alternate energy pundits keep telling us it is cheaper than fossil fuel, so damn. It does not need any federal funding. If it is profitable, investors would be lining up to fund it.

I see this as a proper stoppage of wasting federal funds. Let the recipients of the power fund it.
 
I read a bit on it. So apparently this was part of the Biden administration expenditures claiming more USA jobs. Shouldn't all the sourced material be USA made as well?
 
If they leave it sitting there partially finished, it might not be fixable / completable when an adult administration finally takes over.
Anything in/near salt water requires regular maintenance.
 