So you all remember when I started to work on this bathroom in February? Neither do I - that's a damn long time ago. Well I've been slowly chipping away at it solo. Now my classes have started and I have only the weekend-time to work on it, sadly.
The tile is finally done (always takes me a very long time)
The key element: the toilet: is installed and functional.
(This pic was taken from standing on the tub, by the way - and with my crappy cellphone since my camera's broken
)
So - this coming weekend I'll connect the drain for the tub so that'll be usable - and hopefully I can install the sinks (we modified an old dresser to house two sink-units . . . that needs to be coated before I can set it in place, might take another week for that)
None the less - it's much more done than it was just one month ago - or 6, depending on how you look at it!
The tile is finally done (always takes me a very long time)
The key element: the toilet: is installed and functional.
(This pic was taken from standing on the tub, by the way - and with my crappy cellphone since my camera's broken

So - this coming weekend I'll connect the drain for the tub so that'll be usable - and hopefully I can install the sinks (we modified an old dresser to house two sink-units . . . that needs to be coated before I can set it in place, might take another week for that)
None the less - it's much more done than it was just one month ago - or 6, depending on how you look at it!